北京金正纵横信息咨询有限公司
在线联系

如果您有任何问题,欢迎联系我们

地址:北京市丰台区南三环西路16号

电话:010-63307508

邮箱:jzzh@jzoilgas.com

扫一扫关注“金正能源”公众号
我要咨询

请填写以下需求,我们将为您提供个性化的咨询服务

申请试用

请填写以下表单,我们将尽快为您提供试用服务

如果您想登录平台,进行为期14天的全功能试用,请您填写左侧表格内容并提交至邮箱, 我们将在2个工作日内与您联系,并告知您登陆账户及密码,如有需要, 我们可安排人员去您工作单位进行线下培训交流。如果您有任何问题,欢迎联系我们。

地址:北京市丰台区南三环西路16号

电话:010-63307508

邮箱:jzzh@jzoilgas.com

扫一扫关注“金正能源”公众号

Var Energi (OSE: VAR; the "Company") initiates tow out of the Jotun floating production, storage and offloading vessel (FPSO) from the Worley Rosenberg yard to the Balder field - on schedule for production start by the end of the second quarter this year. "As one of the fastest growing oil and gas companies globally, we are set for transformative growth in 2025, and are on track to reach above 400 thousand barrels of oil equivalent per day (kboepd) in the fourth quarter. Balder X is a key element to this plan and once the Jotun FPSO comes on stream, production from the field will be close to quadrupled, adding around 80 kboepd gross at peak.Balder X, with a payback time of around two years, including the sanctioned Balder Phase V project, marks the start of a new era in the North Sea, extending the lifetime of the first production licence PL001 on the Norwegian ContinentalShelf to 2045 and beyond, and opens a wide potential for continued value creation", says Nick Walker, CEO in V�r Energi.The Balder X project develops gross proved plus probable (2P) reserves of 150 million barrels of oil equivalent (mmboe). In addition, with the Jotun FPSO installed as an area host, V�r Energi is taking necessary steps to add new production through infill drilling, exploration and tie-back developments with short time to market."We have continued to grow our resource base through successful exploration in the area and are stepping up the pace, moving several tie-back projects forwardat speed to capitalise on the Jotun FPSO. This will sustain production longer term and includes Balder Phase V, planned to come on stream later this year, and Balder Phase VI expected to be sanctioned in 2025, together adding a further 45-50 mmboe gross", Torger R�d, COO in Var Energi explains.Also, in the Greater Balder area several new early phase projects are being progressed towards sanction, including Ringhorne North, Balder future phases and the King discovery, targeting gross contingent resources of more than 70 mmboe.While these projects are being moved forward, further exploration drilling is planned to unlock considerable additional resources.The Jotun FPSO also creates an opportunity to optimise the infrastructure in the area, including taking the Balder floating production unit (FPU) to shore for decommissioning, and the planned electrification of the Balder/Grane Area, reducing unit production cost and carbon emissions for the company.The tow out program for the Jotun FPSO from Worley Rosenberg yard in Stavanger includes a number of stages: First, the FPSO vessel will perform inclination tests at the quayside before being towed to Amoyfjorden, near Stavanger, for inshore sea trials and anchor installation work. After this, the vessel will be towed to the field for installation, hook-up to the installed subsea production systems and final commissioning. All 14 production wells are completed, andproduction is planned to start by the end of the second quarter 2025, with an expected three to four months ramp up period to peak production.Var Energi is operator (90%) of the Balder field, with Kistos Energy Norway AS as partner (10%).

相关新闻
    暂无相关新闻